WHIRLPOOL WP C8 WBS EE heat pump dryer 8 kg A+++ white

8 kg capacity The device has 8 kg (cotton) drying capacity. Premium drum design The device premium throws it with special design patterns and clothes lifts to provide outstanding drying results, along...
NOT ON STOCK
The product is not available. Please click on the button to receive a notification if it is available again.

Product description

Color
Weight
Oversized item

8 kg capacity

The device has 8 kg (cotton) drying capacity.

Premium drum design

The device premium throws it with special design patterns and clothes lifts to provide outstanding drying results, along with the protection of the materials.

Premium design

The special design of the Whirlpool dryer ensures that the device is an ornament of your home.

Exceptional design

"Special design. This Whirlpool Dryer will have a unique appearance to be an eye -catching accessory."

User -friendly interface

Easy treatment. The device has an intuitive interface for even easier treatment.

A +++ energy class

Outstanding energy efficiency. The A +++ energy class Whirlpool dryer combines the perfect result with extremely low energy consumption.

6. Sensation Technology

Sensation technology 6 automatically detects the amount of dress loaded and sets the drying time accordingly. This guarantees the desired drought level while optimizing time and power consumption.

Drying level

The device's drying level contributes to the more convenient use.

Anti -crease

The anti -crease function moves the clothes further when the drying process is completed, reducing the creases.

Large -sized clothes program

Extra spacious. Even the most extensive materials will be perfectly dry with the use of large clothes programs.

Children's lock

Activating the button lock option prevents the program settings random or starting the program itself.

Delicate materials

Gentle care. The delicate materials program protects the most sensitive materials while drying them perfectly.

Drainage

Forget the emptying of the water tank. Save time and energy by connecting the drain drain to the central drainage.

Drum lighting

Drum lighting. The drum lighting of our dryers automatically turns on when the drum is opened.

Freshcare+

Keep your clothes fresh up to 6 hours after the cycle is finished. Innovative Freshcare+ system provides your clothes in the dryer thanks to the smart temperature control and gentle drum movement that keeps the clothes fresh and protected from unpleasant odors. The use of Freshcare+ is really fresh and safe to keep the clothes even hours after the cycle is completed. Freshcare+ prevents the spread of unpleasant odors (inside the dryer), even for 6 hours after the drying is completed. The function cannot be used for delicate clothes, extra and wardrobe dry drying.

Gentle drying

Gentle drying at lower temperatures.

Heat pump

Outstanding energy efficiency. With the use of heat pumps, the same result can be achieved as a conventional heating element, but instead of 60 ° C at only 40 ° C.

Inverter engine

Extremely energy -efficient, variable speed engine that allows for more advanced performance and thus special care of the fibers.

Jeans program

Perfect for jeans. The jeans program is designed to dry the jeans gently but effectively.

Quiet

This Whirlpool dryer is designed to produce limited noise emissions.

Quick drying

Fast results. The Rapid Dry feature provides the deserved ideal drying result in a shorter period of time.

Silk program

Safe silk drying. With the silk program, silk materials can be dried safely at very low heat.

Sports program

Perfect for sportswear. The sports program is specifically suitable for drying clothes such as mixed or sensitive sportswear, always providing perfect results.

Launch

Ideal management of time. With the start -up function, you can timed the drying cycle so that it is most comfortable for you.

Steamcare

Gentle care. Antibacterial, gentle drying with steam, which makes clothes friss and simply ironable.

Softmove

Innovative drying technology. The special, assimetric movement of the drum provides a steady distribution of clothes to make the drying result perfect.

Cotton

Gentle wool drying program.

Description:

Programs

- Fine materials
- keypad
- shirts
- gentle
- a mixed program
- Max Starting time (hour): 24
“Farmer
- Reversible door legs
"Silk
- bedding

Structural characteristics

- Indication of the end of cycle: Yes
- Door color: front
- Blocked filter indicator
- Inner lighting: yes
- Weight (kg): 42
- Drying capacity (kg): 8
- Type of installation: freely
- full tank indicator
- Adjustable legs: Yes all
- Length of electrical power cord (cm): 150

Performance

- Normal cotton program time with full load: 174
- Connection value (W): 800
- Current (A): 10
- Weighted annual energy consumption: 177
- Noise level (DBA): 63
- Energy

NOTEBOOK SEARCH

OPINIONS

0.0

No opinions about this product

Help others. Tell us what you think about the item.
The information present here are the ones provided by the manufacturer. These can change without notice. Please inquire before the order, due to te fact that afterwards we cannot asume responsibility! The above images are illustrations. The product might differ in appearance. Our company has no item stock. The purchase is only possible after a previous order. The items list refers to our provider's stock.
Back to the top of the page